What FISP Cycle 10 is, when the Local Law 11 filing deadlines fall, how the 10A/10B/10C sub-cycles work, and how to see every building already filed SWARMP or UNSAFE in your borough.
FISP Cycle 10 is the current round of New York City's Facade Inspection Safety Program, the program created by Local Law 11 (Local Law 10 of 1980, expanded by Local Law 11 of 1998). Every building taller than six stories must retain a Qualified Exterior Wall Inspector (QEWI) to inspect the exterior walls and file a Technical Facade Report classifying the facade as Safe, SWARMP, or Unsafe.
Cycle 10 does not have a single citywide date. Filings are spread across sub-cycles — 10A, 10B, 10C — assigned by the last digit of the building's block number, so your deadline depends on where your building sits. This staggering is exactly why owners and contractors miss windows: the date is building-specific, not universal.
| Sub-cycle | Block last digit (typical) | Status |
|---|---|---|
| 10A | 4, 5, 6, 9 | Filing window open/early |
| 10B | 0, 7, 8 | Active |
| 10C | 1, 2, 3 | Later in the cycle |
(Confirm your exact sub-cycle and due date against the Department of Buildings record for your block — the feed below carries each building's filed status and deadline.)
NYC Data Co maintains the live, scored feed of every building filed SWARMP or UNSAFE in FISP Cycle 10 — with owner, managing agent, filing engineer, fine exposure, and deadline. Sold one contractor per borough.
Manhattan → Brooklyn → Queens → Bronx → Staten Island →
One seat per borough. $499/month. Every Cycle 10 SWARMP/UNSAFE building, scored by fine exposure, refreshed as the city posts new filings.
Open the FISP Hub See pricingRelated: What is FISP / Local Law 11? · What does SWARMP mean?