A plain-English guide to what SWARMP means, how FISP / Local Law 11 facade cycles work, the Cycle 10 deadlines, and how to see every SWARMP and UNSAFE building in your borough.
SWARMP stands for Safe With a Repair or Engineering Monitoring Program. It is one of the three classifications a Qualified Exterior Wall Inspector (QEWI) can assign to a building's facade under New York City's Facade Inspection Safety Program (FISP), enacted as Local Law 11 (originally Local Law 10 of 1980).
A SWARMP facade is not an immediate danger today, but it has deteriorated conditions — cracked masonry, spalling, loose terra cotta, failing lintels — that must be repaired before the end of the current inspection cycle. If a SWARMP condition is not fixed in time, it becomes UNSAFE at the next filing, which triggers mandatory sidewalk sheds, expedited repairs, and escalating penalties.
| Status | What it means | Obligation |
|---|---|---|
| Safe | No significant defects. | Re-inspect next cycle. |
| SWARMP | Defects that are not yet hazardous but will worsen. | Repair before the next cycle or it becomes Unsafe. |
| UNSAFE | Conditions that threaten public safety now. | Immediate protection (sidewalk shed), repair within strict deadlines, ECB exposure. |
FISP Cycle 10 is the current round of Local Law 11 inspections. Every building over six stories must have its exterior walls inspected by a QEWI, who files a Technical Facade Report classifying the facade. Filings run on a staggered sub-cycle schedule (10A, 10B, …) based on the last digit of the block, so different buildings have different deadlines across the cycle window.
Missing a filing window, or leaving a SWARMP condition unrepaired into the next cycle, is what converts a manageable repair into an UNSAFE designation with fines and a sidewalk shed clock.
The NYC Department of Buildings refers FISP non-compliance to the Office of Administrative Trials and Hearings (OATH/ECB). Typical exposure:
NYC Data Co maintains the live, scored feed of every building filed SWARMP or UNSAFE under FISP / Local Law 11 — cross-referenced to the owner, managing agent, filing engineer, ECB fine exposure, and repair deadline. It is sold one contractor per borough, so your competition is locked out of the same leads.
Manhattan feed → Brooklyn feed → Queens feed → Bronx feed → Staten Island feed →
One seat per borough. $499/month. Every SWARMP/UNSAFE building, scored by fine exposure, refreshed as the city posts new filings.
Open the FISP Hub See pricingSafe With a Repair or Engineering Monitoring Program — a facade with defects that must be repaired before the next FISP cycle or it becomes UNSAFE.
The current round of Local Law 11 facade inspections for buildings over six stories, filed by a QEWI on a staggered sub-cycle schedule.
ECB penalties commonly run $5,000–$25,000, plus $1,000/month for failure to file, plus the repair cost.